Vesgantti 118" 8 Seats Modular Sectional Sleeper Sofa with Storage, Black - image 1
Vesgantti 118" 8 Seats Modular Sectional Sleeper Sofa with Storage, Black - image 2
Vesgantti 118" 8 Seats Modular Sectional Sleeper Sofa with Storage, Black - image 3
Vesgantti 118" 8 Seats Modular Sectional Sleeper Sofa with Storage, Black - image 4
Vesgantti 118" 8 Seats Modular Sectional Sleeper Sofa with Storage, Black - image 5
Vesgantti 118" 8 Seats Modular Sectional Sleeper Sofa with Storage, Black - image 6
Vesgantti 118" 8 Seats Modular Sectional Sleeper Sofa with Storage, Black - image 7
Promo Code

Vesgantti 118" 8 Seats Modular Sectional Sleeper Sofa with Storage, Black

-49%

$475.00

$949.99

Current Price
—
List Price
$1499.99
30-Day Avg
$1499.99
Lowest Ever
$799.99
ASIN
B0FVSTYFX5
Model
Velvet Exper
Color
Black
Size
8 Seats-Sleeper Sofa

Available Codes

Login and get the promocode

Best for

  • Families
  • Apartment Dwellers
  • New Homeowners
  • Vesgantti Fans

DealHurryUp LLC is a participant in the Amazon Services LLC Associates Program, an affiliate advertising program designed to provide a means for sites to earn advertising fees by advertising and linking to amazon.com. Amazon, the Amazon logo, AmazonSupply, and the AmazonSupply logo are trademarks of Amazon.com, Inc. or its affiliates.

Read our full affiliate disclosure policy here.

Price History

Price history chart is not available

Details

MODULAR SPACE-SAVING SECTIONAL SOFA – The Vesgantti modular sofa features a full modular design with a clean modern aesthetic, ideal for apartments, condos, studios, offices, basements, and family rooms. It can be freely reconfigured into a living room couch, sofa bed, U-shaped sectional, or corner sofa to fit different layouts and lifestyles. Overall dimensions: 118.3”W x 59.8”L x 26.8”H, making it a versatile centerpiece for small to medium living spaces
CUSTOMIZABLE COMFORT WITH ADJUSTABLE ERGONOMICS – Vesgantti sleeper sofa is engineered for personalized comfort, featuring a generous 27–54 inch adjustable seat depth with soft cushions and high-density memory foam for ergonomic support. Human-centered design allows the backrest and armrest to be adjusted to multiple angles, offering flexible lounging, sitting, and reclining positions. Designed for everyday comfort in small-space living without compromising support
HIDDEN STORAGE DESIGN FOR SPACE EFFICIENCY – Practicality is enhanced with built-in storage compartments under each seat and ottoman, helping maximize space in compact homes. Each compartment measures 23.4"L x 23.4"W x 6.7"H and includes a detachable partition with wide-opening access, making it easy to store and organize blankets, pillows, clothing, toys, and daily essentials while keeping your living space clutter-free
MODULAR EASY ASSEMBLY & FLEXIBLE CONFIGURATION – The deep seat modular sectional sofa features a modular design for simple assembly and flexible reconfiguration to fit your space needs. The sofa arrives in 6 packages (may arrive separately) with all necessary tools and clear instructions included for setup in about one hour. Two leg height options (2.76" & 4.72") allow you to create a low modern profile or extra clearance for convenient robot vacuum cleaning
DURABLE CONSTRUCTION & PREMIUM PET-FRIENDLY FABRIC – Built with a reinforced FSC-certified hardwood frame, this sectional storage couch ensures long-lasting stability, strength, and shape retention. Upholstered in premium velvet fabric, it is soft, skin-friendly, and designed to be scratch-resistant, durable, and pet-friendly while helping conceal everyday marks and wear. Backed by a dedicated customer service team for reliable post-purchase support

Deal Summary

This Vesgantti deal offers the Vesgantti 118" 8 Seats Modular Sectional Sleeper Sofa with Storage, Black for $475.00 USD, down from $949.99 USD, representing a 50% discount. Last verified on .

Current Price
$475.00 USD as of
Original Price
$949.99 USD
Discount
50% off with code 535BQR0N → final $237.50 USD
Brand
Vesgantti
Category
Today's new
ASIN
B0FVSTYFX5
Last Verified

Why this deal is notable

The current 50% discount is below the Amazon list price for the Vesgantti 118" 8 Seats Modular Sectional Sleeper Sofa with Storage, Black. The 50% off coupon (code 535BQR0N) is included for additional savings on this Vesgantti 118" 8 Seats Modular Sectional Sleeper Sofa with Storage, Black. Stock is currently available on Amazon as of October 2, 2026.

Guess You Like

Similar Items

Vesgantti 118" 8 Seats Modular Sectional Sleeper Sofa with Storage, Black
Vesgantti 118" 8 Seats Modular Sectional Sleeper Sofa with Storage, Black
49% off
Promo Code
$475.00 $949.99
Amazon
Universal Furniture Miranda Kerr Love Joy Bliss Fabric Vanity Chair in White
Universal Furniture Miranda Kerr Love Joy Bliss Fabric Vanity Chair in White
19% off
Promo Code
$756.00 $945.00
Amazon
WorthFurni 112" Modular Sectional Sofa U Shape Couches with Storage Ottoman and Washable Cushion Cover for Living Room, Bedroom, Apartment(Beige)
WorthFurni 112" Modular Sectional Sofa U Shape Couches with Storage Ottoman and Washable Cushion Cover for Living Room, Bedroom, Apartment(Beige)
5% off
Promo Code
$569.99 $599.99
Amazon
VOIR Couch Cover Washable Loveseat Chenille Sofa Slipcover, Warm Stone
VOIR Couch Cover Washable Loveseat Chenille Sofa Slipcover, Warm Stone
10% off
Promo Code
$35.99 $39.99
3 Month Low!
Amazon
VOIR Couch Cover Washable 4 Seater Oversize Sofa Chenille Sofa Slipcover
VOIR Couch Cover Washable 4 Seater Oversize Sofa Chenille Sofa Slipcover
10% off
Promo Code
$62.99 $69.99
3 Month Low!
Amazon
Regency Heights Twin Size Striped Comforter Set, Soft Microfiber Reversible Bedding Sets for All Season 5 Pieces Neutral Bed in A Bag Set with Comforter, Sheets, Pillowcase & Sham
Regency Heights Twin Size Striped Comforter Set, Soft Microfiber Reversible Bedding Sets for All Season 5 Pieces Neutral Bed in A Bag Set with Comforter, Sheets, Pillowcase & Sham
65% off
Promo Code
$17.49 $49.99
Amazon
Sorbus Collapsible Storage Ottoman Bench (Black, Large (15” x 43” x 15”))
Sorbus Collapsible Storage Ottoman Bench (Black, Large (15” x 43” x 15”))
20% off
Promo Code
$50.39 $62.99
Amazon
VOIR Couch Cover Washable for 3 Cushion Chenille Sofa Slipcover, Green
VOIR Couch Cover Washable for 3 Cushion Chenille Sofa Slipcover, Green
10% off
Promo Code
$55.79 $61.99
3 Month Low!
Amazon
34.6”Modular Sectional Armless Middle Sofa Seat Boneless Corduroy Cloud Chair for Living Room,Beige
34.6”Modular Sectional Armless Middle Sofa Seat Boneless Corduroy Cloud Chair for Living Room,Beige
49% off
Promo Code
$80.00 $159.99
3 Month Low!
Amazon
WorthFurni 112" Modular Sectional Sofa U Shape Couches with Storage Ottoman and Washable Cushion Cover for Living Room, Bedroom, Apartment(Grey)
WorthFurni 112" Modular Sectional Sofa U Shape Couches with Storage Ottoman and Washable Cushion Cover for Living Room, Bedroom, Apartment(Grey)
5% off
Promo Code
$522.49 $549.99
Amazon
Kingfun Faux Leather 3 Seater Sofa with Rolled Arms,Black
Kingfun Faux Leather 3 Seater Sofa with Rolled Arms,Black
5% off
Promo Code
$370.49 $389.99
Amazon
VOIR Couch Cover Washable 3 Cushion Chenille Sofa Slipcover, Warm Stone
VOIR Couch Cover Washable 3 Cushion Chenille Sofa Slipcover, Warm Stone
10% off
Promo Code
$55.79 $61.99
Amazon
Kingfun Faux Leather 3 Seater Sofa with Rolled Arms,Royal Blue
Kingfun Faux Leather 3 Seater Sofa with Rolled Arms,Royal Blue
5% off
Promo Code
$360.99 $379.99
Amazon
VOIR Couch Cover Washable for 3 Cushion Chenille Sofa Slipcover, Beige
VOIR Couch Cover Washable for 3 Cushion Chenille Sofa Slipcover, Beige
10% off
Promo Code
$55.79 $61.99
Amazon
VOIR Couch Cover Washable for Dogs Chenille Sofa Slipcover, Beige
VOIR Couch Cover Washable for Dogs Chenille Sofa Slipcover, Beige
10% off
Promo Code
$62.99 $69.99
Amazon
VOIR Couch Cover Washable for 2 Cushion Chenille Sofa Slipcover, Beige
VOIR Couch Cover Washable for 2 Cushion Chenille Sofa Slipcover, Beige
10% off
Promo Code
$39.59 $43.99
Amazon
Get the best experience in our app